Decision Tool

Know your lifecycle cost before you compare prices.

The purchase price of a filtration system is one line. What decides the real cost is everything that recurs afterwards — filter elements, change-out labor, downtime exposure and hazardous-waste disposal. This page helps you see those factors for your own duty, then request a project-specific assessment from our engineers.

Cost Drivers

Where the Money Goes Over Time.

We do not publish a generic savings percentage. Your actual lifecycle cost depends on fuel volume, contamination level, filtration duty cycle, local labor rates, disposal costs and system configuration. What we can show — accurately — is which cost factors recur under each approach, and let you assess your own duty below.

Cost FactorTraditional Cartridge / CoalescerJingyuan Membrane System
Filter consumablesRecurring — scales with contamination loadNo cartridges
Filter replacementRecurring — manual change-out eventsAutomatic gas-pulse regeneration
Hazardous waste disposalRecurring — oily element setsSignificantly reduced
Maintenance laborRecurring — every change-outReduced
Membrane corePlanned refresh at 2–3 year design life
Downtime exposureApplication dependentApplication dependent
EnergyApplication dependentApplication dependent
Initial equipmentLower (bare housings)Higher — recovered through the streams above

The structural point: a cartridge program's recurring cost scales with contamination load; a membrane system's does not. Whether that difference pays back on your site is exactly what a project-specific assessment answers.

Step 1
Your duty

Describe your own situation. Nothing here is a price — these are your operating facts.

Step 2
Your unit costs (optional)

Enter your actual figures if known. Leave blank if unknown — blank fields are simply omitted.

The CIS membrane core regenerates automatically by gas pulse — no cartridges to buy, store, change or dispose of. The membrane core has a 2–3 year design life and is refreshed as planned maintenance; the refresh is quoted per project, which is why this tool never guesses a number for it.

Your 3-year burden

Calculated only from the numbers you entered above — no hidden defaults.

These are your own operating facts, not a quotation. For a firm lifecycle comparison — including system configuration, membrane refresh schedule and payback for your site — request the project-specific assessment below.
Request a lifecycle assessment →
Project-Specific Assessment

Let an engineer run the numbers for your site.

Send your duty profile and we will reply with a project-specific lifecycle assessment: recommended configuration, expected consumables eliminated, maintenance plan and the basis for every figure. No obligation.

Your self-assessment entries above are attached automatically to this request, so you don't need to retype them. Replies within one business day.

Want This Assessed Against Your Own Duty Cycle?

Send your tank size, fuel type and monthly throughput. Our engineers build a project-specific lifecycle assessment and reply within one business day.

Request a Lifecycle Assessment Compare All Five Systems