Refinery & Oil Depot · Containerized Skid Station · Field Deployment

JY-Q325 Container Frame Skid Precision Filter Station — 40 m³/h

Direct Answer

The JY-Q325 is a container-frame skid rated 40 m³/h with a 7.5 kW explosion-proof motor for field operations and loading stations. Reduced civil-works requirements, plug-and-play deployment with lifting lugs and forklift slots; gas-pulse backwash flux recovery ≥95%, membrane service life 2–3 years.

40 m³/hCIS rigid membraneNo disposable cartridgesGas-pulse regeneration
JY-Q325 Container Frame Skid Precision Filter Station — 40 m³/h diesel fuel filtration skid
JY-Q325 photo 1JY-Q325 photo 2JY-Q325 photo 3JY-Q325 photo 4
40 m³/hRated flow
Explosion-proofMotor configuration
2–3 yearsDesigned membrane service life
Layer 1 · Quick Specification

30-second specification check.

ModelJY-Q325Containerized skid
Rated flow40 m³/hHigh-flow design
Power configuration7.5 kW explosion-proof motor + centrifugal/gear pumpStandard configuration
Filtration precisionCapture efficiency ≥98% @ ≥5 µm (recommended 5~10 µm)High dirt-holding capacity
Maximum working pressure0.5 MPa (operating 0.2–0.4 MPa)Safe operation
Fluid temperature range0 ~ 70°CLow-temperature wax caution
Applicable mediumDieselFlash point ≥38°C
Equipment materialCarbon steel skid frame standard; stainless steel optionalDurable and anti-corrosion
Seal materialViton fluoroelastomerHigh compatibility
Anti-corrosion gradeC3Industrial environment
Explosion-proof configurationExplosion-proof motor, ExdIIBT4Standard configuration
Engineering interfaceMain oil line DN80 (3") flange; AC 380V three-phaseStandardized
Dimensions3040 × 1700 × 2340 mmContainerized integration
Net weight1850 kgStable and reliable
FootprintApprox. 5.16 m²Modular deployment
Application boundary: Only suitable for diesel with flash point ≥38°C; gasoline and other low-flash-point media are strictly prohibited. Dry nitrogen is recommended for backwash gas, and static grounding must follow site requirements.
How It Works

Process & regeneration.

JY-Q325 membrane separation flowchart
  • 1
    Contaminated diesel in

    Water, sludge and particulates enter with the fuel stream.

  • 2
    CIS membrane separation

    Rigid composite polymer membrane captures particles and strips free water.

  • 3
    Gas-pulse regeneration

    Compressed air clears the membrane surface — no cartridges.

  • 4
    Clean diesel out

    Fuel returns at target cleanliness.

Standards & Compliance

Layer 4 · Compliance basis.

  • Explosion-proof motor configuration
  • Filtration performance based on ISO 16889
  • Static grounding requirement: resistance ≤10Ω
  • Dry nitrogen is recommended for backwash gas
  • Hazardous waste disposal should comply with HW08/HW09 requirements
  • Stainless steel material and whole-machine explosion-proof certification can be customized
Selection Guidance

Is JY-Q325 the right choice?

When JY-Q325 is right

JY-Q325 is right when the site itself is harsh or remote: explosion-proof requirement, reduced civil works, all-weather outdoor operation, modular parallel expansion.

When to consider another model

Indoor installation with lower budget? See JY-DX40. Need higher throughput? See JY-DL60. Required flow between standard sizes? See Custom Flow configurations.

FAQ

JY-Q325 — frequently asked questions.

How long is the membrane module service life?

Designed service life is 2–3 years. Backwash regeneration significantly reduces long-term operating cost.

Can it support harsh field environments?

Yes. The containerized skid and explosion-proof motor are optimized for high-contamination, high-flow field conditions.

Does backwash require shutdown?

Gas-pulse backwash requires short shutdown. Flux recovery reaches ≥95%, keeping maintenance convenient.

Can it remove water from oil?

It efficiently removes free water (≥95%), but cannot remove dissolved water.

Does installation require civil works?

No. It deploys on a flat site as a plug-and-play unit, greatly shortening deployment time.

Is it suitable for gasoline?

No. Only diesel with flash point ≥38°C. Gasoline is strictly prohibited.

Lineup

Other systems in the range.

Request selection & quotation — JY-Q325

We reply within one business day with a matched system recommendation and budget figure. No obligation.

Request a Quote